time1: 0 time2: 0 time3: 0 time4: 0 total: 0 Total Load Control Plan for Environmental Impact Assessment in S
台灣資料通-開放資料查詢 台灣資料通-公開資料預覽查詢
關鍵字資料搜尋

Total Load Control Plan for Environmental Impact Assessment in S

Total Load Control Plan for Environmental Impact Assessment in S」於資料集「EPQSummary_EnvironmentalImpactAssessment」由單位「行政院環境保護署」的陳先生所提供,聯繫電話是02-2311-7722#2386,最近更新時間為:2023-07-30 01:01:43。 欄位Project Title的內容是Total Load Control Plan for Environmental Impact Assessment in Slope-Land Areas—Case Study of Chia-Yi County.and Chia-Yi City , 欄位Project Subject的內容是According to the environmental carrying capacity, total load control aimed to develop and use environmental resources under the acceptable capacity, reducing the impacts and hazards of unsuitable developments and uses. Meanwhile, total load control focuses on the individual environmental characteristics and carrying capacity to determine the standards of total load based on the capacities of water, air and so on. According to the air pollution protecting areas, with the new EPA announcement, except for assigning the third level air pollution protecting area in suspended solid, Chia-Yi Couny and Chia-Yi City are both classified into second level air pollution protecting area. A-Li-Shan Town belonged to National Park is first level air pollution protecting area. Now, according to the seven air-quality controlling area by EPA, Chia-Yi Couny, Chia-Yi City and Yun-Chia-Na air-quailty controlling area will be managed by third level air pollution protecting areas in following form five to ten years. EPA announced various air-pollution protecting level by current monitoring air-quality in Chia-Yi Couny and Chia-Yi City. Moreover, the EPA branch of Chia-Yi County positively controlled various the source of air pollution, executed the air pollution controlling policy, and protected and avoided air quality to worsen to reach national environmental protected goal. Water resources analyses results indicated that the surface water is the major resource of using water could support 165,000 CMD almost 68% of total supplying water. The needs of drinking water are supplied by Hungho-Shan, Mi-Te and Liyu-Tan reservoirs. This water supplying can satisfy the water needs from now up to 2003 in this study area. After 2003, it is essential for creating the new sources of water and rearranging water supply system in this study area. The water pollution analysis results illustrated that the first work is to reduce concentrations of BOD, NH3-N and Ammonia N in Bei-Gang stream. It is first work to reduce BOD in Pu-Zi stream. BOD must be first reduced in Ba-Zhang stream. , 欄位Project Year的內容是2003 , 欄位Organizer的內容是Department of Comprehensive Planning , 欄位Executive Unit的內容是中國文化大學環境設計學院景觀學系 , 欄位Reporting download URL的內容是https://epq.epa.gov.tw/ProjectDoc/FileDownload?fid=2480&proj_id=A000000321062&doc_kind=1 , 欄位Publish Date的內容是20040301

Project Title

Total Load Control Plan for Environmental Impact Assessment in Slope-Land Areas—Case Study of Chia-Yi County.and Chia-Yi City

Project Subject

According to the environmental carrying capacity, total load control aimed to develop and use environmental resources under the acceptable capacity, reducing the impacts and hazards of unsuitable developments and uses. Meanwhile, total load control focuses on the individual environmental characteristics and carrying capacity to determine the standards of total load based on the capacities of water, air and so on. According to the air pollution protecting areas, with the new EPA announcement, except for assigning the third level air pollution protecting area in suspended solid, Chia-Yi Couny and Chia-Yi City are both classified into second level air pollution protecting area. A-Li-Shan Town belonged to National Park is first level air pollution protecting area. Now, according to the seven air-quality controlling area by EPA, Chia-Yi Couny, Chia-Yi City and Yun-Chia-Na air-quailty controlling area will be managed by third level air pollution protecting areas in following form five to ten years. EPA announced various air-pollution protecting level by current monitoring air-quality in Chia-Yi Couny and Chia-Yi City. Moreover, the EPA branch of Chia-Yi County positively controlled various the source of air pollution, executed the air pollution controlling policy, and protected and avoided air quality to worsen to reach national environmental protected goal. Water resources analyses results indicated that the surface water is the major resource of using water could support 165,000 CMD almost 68% of total supplying water. The needs of drinking water are supplied by Hungho-Shan, Mi-Te and Liyu-Tan reservoirs. This water supplying can satisfy the water needs from now up to 2003 in this study area. After 2003, it is essential for creating the new sources of water and rearranging water supply system in this study area. The water pollution analysis results illustrated that the first work is to reduce concentrations of BOD, NH3-N and Ammonia N in Bei-Gang stream. It is first work to reduce BOD in Pu-Zi stream. BOD must be first reduced in Ba-Zhang stream.

Project Year

2003

Organizer

Department of Comprehensive Planning

Executive Unit

中國文化大學環境設計學院景觀學系

Publish Date

20040301

「Total Load Control Plan for Environmental Impact Assessment in S」所屬的資料集:「EPQSummary_EnvironmentalImpactAssessment」的其他資料

Project Title: Case Study and Analysis of Environmental Impact Assessment in the United States of America and Formu
Project Subject: Case Study and Analysis of Environmental Impact Assessment in the United States of America and Formu
Project Year: 2012
Organizer: Department of Comprehensive Planning

Project Title: Project for Assistance on Holding Environmental Impact Assessment Review Meetings
Project Subject: To improve the efficiency and quality of the Environmental Impact Assessment (EIA) review, document
Project Year: 2014
Organizer: Department of Comprehensive Planning

Project Title: "The Supervision Project for Environmental Impact Assessment"
Project Subject: "The scope of the project was the review and supervision the approved environmental impact assessmen
Project Year: 2018
Organizer: "Bureau of Environmental Inspection"

Project Title: Enhanced Environmental Impact Assessment Supervisory and law Enforcement Project 2022
Project Subject: This plan is intended to assist Environmental Protection Administration with the following: (1) Assi
Project Year: 2022
Organizer: Bureau of Environmental Inspection

Project Title: Environmental impact assessment review operations Project after the Implementation of the Geology Ac
Project Subject: Geology Act. is promulgated by the Ministry of Economic Affairs on December 1st 2011. “Geologically
Project Year: 2019
Organizer: Department of Comprehensive Planning

Project Title: "The service of developing carbon information disclosure and carbon label application cloud system"
Project Subject: "Under the global trend of carbon reduction, The Environmental Protection Administration of the Repu
Project Year: 2020
Organizer: "Department of Supervision Evaluation & Dispute Resolution"

Project Title: soils and groundwater
Project Subject: [Project goals] The goal of this project is to establish environmental background data of the farmla
Project Year: 2011
Organizer: Environmental Protection Bureau Yunlin County

Project Title: Inclusion Criteria for Construction Works Required for EIA of transmission line
Project Subject: According to Taiwan’s “Inclusion Criteria for Construction Works Required for Environmental Impact A
Project Year: 2002
Organizer: Department of Comprehensive Planning

Project Title: Research on Non-ionizing Radiation Management and Environmental Monitoring Empirical Technology
Project Subject: This project completed the measurement and evaluation of electromagnetic field levels in specific ar
Project Year: 2020
Organizer: Department of Air Quality Protection & Noise Control

Project Title: Review And Correction about Scoping and Policy Evaluation in Development activity of Environmental I
Project Subject: Recently, more and more development activities are obliged or volunteer to undergo the second stage
Project Year: 2014
Organizer: Department of Comprehensive Planning

Project Title: "The Supervision Project for Environmental Impact Assessment"
Project Subject: "The scope of the project was the review and supervision the approved environmental impact assessmen
Project Year: 2015
Organizer: "Bureau of Environmental Inspection"

Project Title: "Project for Assistance on Holding Environmental Impact Assessment Review Meetings in 2015"
Project Subject: "To improve the efficiency and quality of the Environmental Impact Assessment (EIA) review, document
Project Year: 2014
Organizer: "Department of Comprehensive Planning"

Project Title: "Analysis of Environmental Impact Assessment and decision-making supporting project in 2020"
Project Subject: " The IER was entrusted with the 2020 Analysis of Environmental Impact Assessment and Decision-makin
Project Year: 2020
Organizer: "Department of Comprehensive Planning"

Project Title: "Project for Assistance on Holding EIA Review Meetings in 2017, Evaluation EIA Technical Consulting
Project Subject: "  The main objective of this project is to improve the efficiency and quality of the Environmental
Project Year: 2017
Organizer: "Department of Comprehensive Planning"

Project Title: "The Supervision Project for Environmental Impact Assessment"
Project Subject: "This annual project reviewed and supervised the approved environmental impact assessment (EIA) repo
Project Year: 2013
Organizer: "Bureau of Environmental Inspection"

Project Title: Project for Assistance on Holding EIA Review Meetings in 2021, Evaluation of EIA Technical Consultin
Project Subject: The main objective of this project is to improve the efficiency and qualityof the Environmental Impa
Project Year: 2021
Organizer: Department of Comprehensive Planning

Project Title: "Environmental Impact Assessment Inquiry Application System data collection and maintenance project"
Project Subject: "This project had developed many results this year in the Environmental Impact Assessment inquiry ap
Project Year: 2013
Organizer: "Department of Comprehensive Planning"

Project Title: 101 Environmental Impact Assessment Inquiry Application System data collection and maintenance proje
Project Subject: This project had developed many results this year in the Environmental Impact Assessment inquiry app
Project Year: 2012
Organizer: Department of Comprehensive Planning

Project Title: Environmental Impact Assessment Inquiry System – to Expand the EIA Review Data
Project Subject: This project had developed many results this year in the Environmental Impact Assessment inquiry app
Project Year: 2009
Organizer: Department of Comprehensive Planning

Project Title: "Analysis of Environmental Impact Assessment and decision-making supporting project in 2021"
Project Subject: "The scope of the project includes the data collection and analysis, for the Environmental Impact As
Project Year: 2021
Organizer: "Department of Comprehensive Planning"

Project Title: The establishes for the Environmental Impact Assessment system
Project Subject: The environmental protection bureau for the effective use of information bank management and impetus
Project Year: 2004
Organizer: Department of Comprehensive Planning

Project Title: "Environmental Impact Assessment Inquiry Application System Management and Maintenance Project"
Project Subject: "This project had developed many results this year in the Environmental Impact Assessment inquiry ap
Project Year: 2018
Organizer: "Department of Comprehensive Planning"

Project Title: 109 Annual Poison and Chemical Source Inspection Management Plan
Project Subject: In order to effectively check and manage the operation and use of the environmental impact assessmen
Project Year: 2020
Organizer: Environmental Protection Bureau, Chiayi County

Project Title: Evaluation of Technical Consulting Firms on Environmental Impact Assessment in Fiscal Year 2008
Project Subject: The Environmental Protection Administration (EPA) has initiated “The evaluation of Technical Consult
Project Year: 2008
Organizer: Department of Comprehensive Planning

Project Title: "-"
Project Subject: "-"
Project Year: 2018
Organizer: "Environmental Protection Bureau, Taichung City"

Project Title: Control Strategy of Air Pollutants such as PM2.5 and Ozone
Project Subject: The purposes of this project include to evaluate the PM2.5 forecasting system, to analyze the water
Project Year: 2016
Organizer: Department of Air Quality Protection & Noise Control

Project Title: "Climate Change Impact Assessment and Adaptation Cooperation Mechanism Analysis"
Project Subject: "In order to strengthen national adaptive capacity, decrease the social vulnerability, and establish
Project Year: 2016
Organizer: "Office of Greenhouse Gases Reduction Management"

Project Title: The Supervision Project for Environmental Impact Assessment
Project Subject: The scope of the project was the review and supervision the approved environmental impact assessment
Project Year: 2016
Organizer: Bureau of Environmental Inspection

Project Title: Work Plan to optimize the Reporting System of Environmental Impact Assessment Commitment Statements
Project Subject: The previous version of Reporting System of Environmental Impact Assessment Commitment Statements wa
Project Year: 2019
Organizer: Bureau of Environmental Inspection

Project Title: "A Study of the Application of Technical Guidelines for Social Impact Assessment in Environmental Im
Project Subject: "The aim of environmental impact assessment (EIA) is to make the potential impacts of development pr
Project Year: 2016
Organizer: "Department of Comprehensive Planning"

行政院環境保護署 的其他資料集

符合噪音管制標準車輛-國產柴油引擎車

不定期更新更新,160

林先生 | 02-23712121-6403 | 2022-01-14 01:18:57

行政院環境保護署

非游離輻射檢測資料

每1月更新,110

張先生 | 02-23117722#6402 | 2023-08-07 01:02:15

行政院環境保護署

固定污染源CEMS監測數據紀錄值資料集(6分鐘紀錄值)

每小時更新更新,166

陳小姐 | 02-23117722分機6216 | 2022-01-14 01:02:55

行政院環境保護署

環境影響評估技術顧問機構評鑑成果

2年更新,41

劉先生 | 02-23117722#2743 | 2022-01-15 01:12:19

行政院環境保護署

重金屬污染農地管理及改善技術評析計畫

每6月更新,265

黃先生 | 02-23832389#8204 | 2023-07-30 01:01:14

行政院環境保護署

0800資源回收免費專線-一般件問題查詢廢資訊物品統計

每年更新更新,54

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:26

行政院環境保護署

0800資源回收免費專線-查詢非業務範圍統計

每年更新更新,40

莊先生 | 02-23705888#3108 | 2022-01-14 01:24:30

行政院環境保護署

噪音實收罰鍰

每年更新更新,51

謝小姐 | 02-23117722#2103 | 2022-01-14 01:22:42

行政院環境保護署

縣市(高雄市)小時值-每小時

每小時更新更新,134

謝小姐 | 02-2311-7722#2386 | 2022-01-14 01:01:08

行政院環境保護署

室內空氣品質公告場所定期檢測結果

不定期更新更新,115

蔣小姐 | 02-23117722#6406 | 2023-07-30 01:04:48

行政院環境保護署

EPQSummary_EnvironmentalMonitoringAndTesting

不定期更新更新,136

陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:45

行政院環境保護署

道路之開發類別環境影響評估報告書

每2月更新,41

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:17

行政院環境保護署

光化測站(橋頭)小時值資料

不定期更新更新,163

陳先生 | 02-2311-7722#2386 | 2023-08-07 01:03:34

行政院環境保護署

EPQSummary_NoiseAndVibration

不定期更新更新,120

陳先生 | 02-2311-7722#2386 | 2023-07-30 01:01:50

行政院環境保護署

六輕相關計畫環評監督委員會會議紀錄

每季更新更新,48

陳先生 | 04-22521718#51207 | 2022-01-14 01:21:58

行政院環境保護署

焚化爐廠區範圍圖

不定期更新更新,29

張小姐 | 02-23712121#5907 | 2022-01-15 01:16:17

行政院環境保護署

推薦機關(薦舉)環境教育人員認證申請書

不定期更新更新,36

盧小姐 | (03)4020789分機606 | 2023-08-09 01:05:27

行政院環境保護署

EPQSummary_WaterQualityProtection

不定期更新更新,127

郭先生 | 02-2311-7722 EXT.2399 | 2022-01-15 01:13:47

行政院環境保護署

公民營廢棄物清除機構數

每1年更新,95

顏先生 | 02-23117722#2109 | 2023-07-27 01:00:41

行政院環境保護署

台灣地區垃圾處理場(廠)互惠緊急支援要點

不定期更新,32

蔡先生 | 04-2252-1718#53508 | 2022-01-15 01:13:13

行政院環境保護署

阿公店溪及愛河環境優化願景聯繫會報

不定期更新,50

葉先生 | 02-2311-7722#2846 | 2022-01-15 01:12:50

行政院環境保護署

經過飲用水水源水質保護區之環境影響評估報告書

每2月更新,54

黃先生 | 02-23117722#2748 | 2023-08-05 01:00:58

行政院環境保護署

環境影響評估開發案基本資料

每2月更新,145

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:25

行政院環境保護署

空氣品質小時值_臺北市_陽明站

每1時更新,228

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:57:32

行政院環境保護署

空氣品質小時值_新北市_板橋站

每1時更新,92

陳先生 | 02-2311-7722#2386 | 2023-08-02 00:58:18

行政院環境保護署

環評主管機關受理審查之環境影響說明書

每2月更新,111

黃先生 | 02-23117722#2748 | 2023-08-06 01:04:32

行政院環境保護署

環保署職員官等年齡統計資料

不定期更新更新,39

黃小姐 | 02-23117722分機2132 | 2022-01-15 01:12:56

行政院環境保護署

環境用藥販賣業許可執照資料

每3月更新,122

薛先生 | 02-2325-7399#55413 | 2023-07-27 01:02:58

行政院環境保護署

MajorEnvironmentalPolicies

每3月更新,163

陳小姐 | (02)23117722#2753,(02)23117722#2756 | 2023-07-30 01:03:45

行政院環境保護署

建檔公廁明細-苗栗縣

不定期更新更新,98

賴先生 | 04-2252-1718#53686 | 2023-07-27 01:02:05

行政院環境保護署